A local media report indicates a city in Ohio will pay less than expected to demolish a bridge, thanks to the steel content of the aging structure combined with a high-value ferrous scrap market.
A late March online report from the Youngstown Vindicator in Ohio says the three bids that city received to demolish a bridge over an abandoned railroad right of way were “significantly less than the city’s estimate” for the project.
A deputy director of public works quoted by the newspaper said, “There’s so much steel on the bridge, which was a factor in the estimate being high. We’re conservative with the salvage value of steel.”
While the city reported estimated it would receive bids in the $950,000 range, instead the three bids made checked in at between $580,000 and $650,000.
The Vindicator describes the structure as a 78-foot steel girder structure that is in “poor condition.”
Latest from Construction & Demolition Recycling
- Canton, Ohio, nonprofit helps divert building materials for reuse
- Ferrous market ends 2024 in familiar rut
- NDA to offer certification test at convention
- Hyster-Yale commits to US production
- World Cement Association highlights challenges facing long-term cement demand
- Tata Steel to supply equipment maker JCB
- Light House embarks on construction site plastic scrap recycling effort
- NDA accepting nominations for safety awards