
Keltbray, an Esher, England-based demolition contractor, recently posted a video detailing how the company methodically engineered a way to remove a bridge at the Ferrybridge “C” Power Station in West Yorkshire, England. The bridge needed to be removed as part of the company’s comprehensive demolition work at the site.
The company conducted a comparative risk assessment to determine the safest way to demolish the bridge before formulating a strategy to deploy a crane on a reinforced concrete pad to lift the structure, which would later be sheared on-site.
Watch the video below, courtesy of Sky Captain Aerial Imaging:
Get curated news on YOUR industry.
Enter your email to receive our newsletters.Latest from Construction & Demolition Recycling
- LRS diverts 330,000 tons of recyclable material in 2024
- Elevating industry standards
- Takeuchi adds dealer locations in central US
- Tariffs target steel exporters Brazil, Canada and South Korea
- Toyota-Tsusho completes acquisition of Radius Recycling
- Motion opens new branch in Quebec
- Terex M515 trommel designed for rip rap production
- Lippmann adds dealer in Pacific Northwest